2013 Move

From Kwartzlab
(Difference between revisions)
Jump to: navigation, search
(Kitchen)
(Kitchenette)
Line 153: Line 153:
  
 
Materials Needed
 
Materials Needed
 +
* Studs (dims TBD)
 +
* Drywall (stairwell)
 +
* Kitchen-safe drywall (kitchen)
 
* Range
 
* Range
 
* Refrigerator
 
* Refrigerator

Revision as of 17:17, 8 January 2013

Our goal is to have the space ready for a February 1st grand opening!


Current Floorplan: File:33 Kent - Layout - Variant O.pdf


Contents

Timetable for Moving

  • Decide which walls to be knocked down. Has a plan been decided on?
  • Start knocking down walls Dec. 23
  • Build wall for laser room
  • set up shelving
  • mid-January: move laser
  • move bins

Major Projects

There are various projects that need someone to head them up. If you can volunteer for them (lead or otherwise), please drop your name in the project list.

Team leads will be responsible for compiling costs for their project to be approved by the board.

Signage

Lead: Doug

Volunteers:

  • Require a new sign for the back of the building (currently unlit, looking for solutions)
  • Require a new sign for the front of the building

Computer Cabling

Lead: Ben

Volunteers: Stephen Paul Weber Andrew

  • Remove existing network cabling in the building
  • Setup rack/patch panel in central location
  • Run drops for downstairs work area, tool area and upstairs
  • New switches, router and wireless AP (Ben has the equipment)

Electrical

Lead: Jon

Volunteers: Bob Andrew

  • Assess current electrical drops from front and rear panels
  • Run cabling for larger machines, various drops along walls (and ceiling?)
  • Run cabling for upstairs outlets (would also require a 220v for stove, if Kitchen is going upstairs)
  • Strip usable wiring infrastructure from old premises

Plumbing

Lead: Taylor

Volunteers: Bob Andrew

  • Work on bathroom, check existing plumbing & drainage
  • Sink in the clean area would be a plus
  • Upstairs sink (If kitchen goes there)

Flooring

Lead: Darcy

Volunteers: Jaymis (I assume the status of the flooring will affect when/where walls can be moved), Steph Andrew

  • Upstairs floor:
  • Plywood underlayment
  • Karl's carpet tiles
  • Tile in kitchen.
  • Downstairs floor:
  • Needs to be stripped and etched?
  • BEHR Non-Skid Floor Finish Additive is $4.99/85 grams (enough for 3.79L of paint, epoxy, or stain)
  • ~1000sqft to cover
  • Bathroom, access hallway
  • Tiled if possible/easy/cheap.
  • Raising garage area floor deferred to later date.

Walls

Lead: Jaymis?

Volunteers: Steph (painting), Darcy

  • Knocking out existing walls (GUS SMASH)
  • Building new walls per our layout
  • Repair existing drywall
  • Painting!

Dust Collection

Lead:

Volunteers:

  • Figure out location for our already-purchased dust collector
  • Work with electrical team for 220v drop
  • Plan venting in regards to machine locations

Ventilation

Lead: Chris V?

Volunteers:

  • Determine placement and routing of ducts and fan motor for (a) laser, (b) including upstairs kitchen if stove hood required.
  • Purchase additional ducting (if required) and install.
  • Install fan motor (near garage door?)
  • Reroute existing air ducts once ceiling is removed to tidy appearance. Air return ducting may be required.

Shop Facilities

Lead:

Volunteers:

  • Work benches
  • Material Storage
  • Tool organization

Kitchenette

Buildout status: https://docs.google.com/spreadsheet/ccc?key=0Ag99_XWHM-KYdFdDb2pqR0d3TU5XZGxqeWNPZkxhSHc#gid=0

Lead: Andrew

Volunteers:

  • Wall framing
  • Coordinate w/electrical
    • 1x220v
    • 3x110v (1 for refrigerator, 2 countertop)
  • Coordinate with plumbing
  • Coordinate with flooring
    • Hot
    • Cold
    • Drain
  • Drywall & putty
    • Kitchen-facing
    • Stairwell-facing
  • Paint wall
    • Kitchen-facing
    • Stairwell-facing
  • Install cabinetry
    • Overhead (likely from Boehmer)
    • Countertop
    • Sink
  • Install furniture
    • Refrigerator
    • Range
    • (optional) Stairwell storage

Materials Needed

  • Studs (dims TBD)
  • Drywall (stairwell)
  • Kitchen-safe drywall (kitchen)
  • Range
  • Refrigerator
  • Corner guards
  • Range hood
  • Lower cabinets & countertop
  • Upper cabinets (Done - from Boehmer)
  • Kitchen sink (Don L?)
  • Flooring
Personal tools
Navigation